Client: Private client

Purpose: Side extension to property

Ground Conditions: Upper clays into hard gravels

Pile Type: 76r

Depth: 6m

Quantity: 16no

Additional Work: None

Location: West London

Completed: September 2015

Duration: 2 days

Nice and simple project.

The client had employed a builder to construct a pre fabricated wooden structure to enable simple fast installation of the building.

No concrete was required as the structure was to be attached directly to the piles.

As there were tree and underground services in close proximity screwpiling proved to be the fastest, cleanest and the least risk system.

 