Customer need to extend existing footprint of the premises, due to the area being approx 600mm lower using screw piles eliminated the need for considerable floor build up but more importantly time.
Screw piling, steel frame and Hody profiled sheets ( https://www.cdi-icm/system/hody/) installed in 5 days ready for mesh and concrete pour to a depth of 130mm