Civil

Case study

Hackney rail

Completed: April 2017
Client: Volker Rail
Purpose: Support overhead structure to enable excavations
Ground Conditions: Made up ground, clay and gravel
Pile type: 219mm
Depth: 9m
Quantity: 8
Additional work: Grillage fabricated and installed
Location: Hackney, London

The only option for this project was screwpiling.

Using this amazing machine with a 22m reach, we were able to install and support structures on both sides of the line to enable Volker to excavate in close proximity.

A great challenge with a great outcome.