The client required a shed base to take a large load.
He wanted to reduce the risk of a base failing from the use of concrete due to the tree root movements also concerned for the tree roots.
As it was also on a slope it would have increased excavations and concrete required.
This simple base was installed in one day.
- No tree damage
- No earth removed
- No noise
- No waiting for drying
- Ready to go!